|
Atlanta Area Ant/Beetle Arena Build Report
|
|
Lionel Vogt came down this
weekend to help build the new arena. Here he is putting the floor frame together. We used 2" square steel tubing for the frame. |
|
Here I am cutting out holes in the
frame corners for the bolts to hold the frame to the corner posts. This worked out really well to hold it together straight. |
|
This is a closeup of the assembled
corner. Tha is a 3/4" bolt holding the cornerpost to the bottom. This proved very strong. |
|
And here is Lionel again, posing
with the end product of 5 hours work. The wooden base will sit inside the tubing on the bottom supports. This will put the floor one foot over the ground. That leaves plenty of room for hazards... |
|
The end of Day 2 arena build. We
finished the corner posts, finished the top and assembled. Welded hinges for the top lexan and set the first piece of 1/2" MDF in place for the floor. Unfortunately, where we had the cuts done at the store were 1/2" off (Correct dimension, incorrect cut). We took it apart and took it home to finish it next weekend. |